Geomembrane
for Protection of the Cell Berm and the Leachate Subdrainage System (quality
control of aggregates, filter materials and soil compaction)
|
||
Leachate Pond.Quality Control in Soil Compaction (berms and dikes construction) | ||
Blasted
Rock: 310,977.33 m3Scarified Rock: 15,963.00 m3Total: 326,940.30
m3
|
||
Geotechnical
Study and Pavement Design for Construction of the Access Road to the
Urban Waste Disposal Center
(landfill)
El Guayabal
|
||
Earth Movement: 1,330,320.00 m3 Fills: 555,820.00 m3 Total volume of earthwork with quality control: 1,886,140.00 m3 in eight (08) months. |