Corporate Office:
Av. Universidad No. 60, C.C. Universidad, Locales 3 y 4,
El Limón, Maracay
Edo. Aragua - Venezuela
Tlfs.: (58-0243) 283.85.23 - 283.55.66
Cel: (58 416) 645.41.73
Fax : (58-0243) 283.97.10


Developed by: Saintel Consultores, C.A
Company of Iseca Group

Contac Us

VATRA-CINTEC
Geomembrane for Protection of the Cell Berm and the Leachate Subdrainage System (quality control of aggregates, filter materials and soil compaction)
Geomembrane for Protection of Cell Berm and Leachate Subdrainage System
Leachate Pond. Quality Control in Soil Compaction (berms and dikes construction) Leachate Pond. Quality Control in Soils (berms compaction)
Blasted Rock: 310,977.33 m3 Scarified Rock: 15,963.00 m3 Total: 326,940.30 m3
Geotechnical Study and Pavement Design for Construction of the Access Road to the Urban Waste Disposal Center (landfill)           “El Guayabal”  
Access Road to the Urban Waste Disposal Center “El Guayabal”
Earth Movement: 1,330,320.00 m3 Fills: 555,820.00 m3 Total volume of earthwork with quality control: 1,886,140.00 m3 in eight (08) months.
    | Iseca Group Corp Spanish Version | Home | Our Organization | Service Capabilities | Our Team | Main Clients | Construction Engineering | Inspection and Quality Control |Geotechnical and Geo-environmental |  Contact Us | Top |